Place pea gravel in the area that you removed dirt and compact with a hand tamper. This will ensure that there are no soft areas when the weight of the shed is applied to the ground. Another option is to have the pros come in and build a concrete pad, although be prepared to spend significantly more on this. In the case of a 11’x13’ shed foundation, you would extend the line 11’, and drive in another stake. Once that’s done, start by removing all of the topsoil for the entire area that you’ve marked out, including the areas that don’t need to be excavated. Put a long board or beam on top of the blocks with a level on it to get the foundation level in all directions. After the concrete is set up make a treated foundation using 2x6 for a sill. In cases in which you need to level an area with a steep gradient, typically when one side is more than 8” higher or lower than the other side, you may need to build a retaining wall to prevent the slope that you’ve cut into from eventually eroding into your shed. Make sure to move the plank throughout the area to ensure that the entire plot is even adding or removing soil where needed. Add pea gravel until it is nearly flush with the ground. If you plan on creating a gravel pad for your shed foundation, then it should be 1’-2’ larger than the shed itself to account for a proper buffer. Generally speaking, your shed foundation should allow for at least 12” extra on each side of the building itself. Unlike the graded area, which is larger than the actual shed, your concrete blocks will need to line up with the shed’s actual dimensions. 2 Use a string level. A steeper grade will require more blocks on the low side to achieve a level base. Don’t make an educated guess. Note: If you are lucky your shed site will be relatively level. You can do this by first putting in concrete, timber decking, or a garden slab. Outline the shed area with some edge restraints of plastic, metal or wood. The dimensions of the pad should match the shed size. Haring holds a Bachelor of Journalism from the University of Missouri. Find another use for it on your property. Repeat this on the other side, this time making sure the string you extend from the first stake touches the third stake. You now have a shape that you can use to square the rest of your shed foundation. I then covered frame with PT 1/2 inch plywood. All Rights Reserved. Lag it down to the foundation and bam, you have a shed. Use the thinner 2” blocks during the leveling process to align all sides. Begin by locating the first corner and pounding in stake number one. If you opt for leveling the ground by excavating, then it’s time to begin digging. There are also gophers or moles here (underground), which makes the dirt unpr… If the shed is not level, parts may prove difficult to assemble. Remove the grass from the area where you're placing the shed. Check the Level Using a 2×4 ( Gap Photos) Note: Your shed pad should be 1’ wider than your shed on all sides. You’ll also need wooden grade stakes, a mallet, and a string line. Your shed’s overall footprint is about 25% larger than the actual shed to account for proper spacing between other structures and your property line. Which blocks should you purchase? So, you’ve committed to building that shed, or maybe you’ve ordered a pre-built shed to be delivered to your property. Make sure the string touches the second stake slightly. Many of us don’t have a naturally flat back yard. Fill the area with gravel and compact it with a hand tamper. Make sure to consider this when staking out the site. Put a long board or beam on top of the blocks with a level on it to get the foundation level in all directions. These plastics are very eco-friendly and made to last for many years without rotting. Vary the depth to get the top level. To check that your supports are level, rest a 2×4 from one block support to another block support. Our video shows how easy it is to get your site prepared and ready for your shed delivery from The Shed Yard. You can then add either gravel, pressure-treated wood or plastic shims between your skids and joists to level your shed. Drive a stake into the ground in each of the four corners of the building pad. A shed is a great addition to a yard. Ground preparation is a crucial part of installing a plastic shed base, without the correct preparation the benefits such as permeabililty will not be as effective. If the slope is fairly steep, dig out an area at the front of the shed. Therefore, you should use the shed’s actual dimensions when staking the corners if you are using this method. He is passionately interested in home improvement, renovation and woodworking. How to Level the Ground 1) First of all, you need to mark out the area (this area should be the total size of your chosen plastic shed base, bearing in mind our Shed Base panels are 13″ square). This is probably the most difficult part of this process, but it’s also the most critical to create a square shed foundation. If you choose this method, you will need to Smooth it out evenly using your 2×4 plank and level to even the surface out. Any time you are digging into your yard, it’s essential that you know exactly where your utility lines are. Once you’ve removed the topsoil, eyeball, which part of the area looks higher than the other and begin removing the subsoil. I suggest buying the blocks in both 4” and 2” thicknesses. Since retiring he has written freelance stories and a weekly computer security column. Begin by marking and squaring the site as in step one of this guide with one exception. Outline the shed area with some edge restraints of plastic, metal or wood. Now that you’ve completed the soil removal, it’s time to get out that 2×4 plank and see if it’s level or not. Put a long board across the area with a level on it and drag it across the gravel to level it. Concrete Hard-standing - When using concrete as a surface to support your new shed, you must ensure that it is level, flat and that it is dry in time for your shed delivery and installation. This is the amount the shed floor drops in 4 feet. After pounding in your second stake, measure 3’ from the first stake. You can create a gravel pad by filling the area with a 4-5” of pea gravel. Use the thinner 2” blocks during the leveling process to align all sides. It’s important to plan your foundation with some extra space around your shed. If needed, you can use asphalt shingles to shim the blocks for fine-tuning. Remember, the idea here is to create a level surface, so remove the soil as evenly as you can without leaving a lot of inconsistencies. Constructing, a flat shed base, even if it is on uneven ground, is incredibly important. Set vinyl floor on this platform and put up shed. Add six inches to all sides of the dimensions where the slab will be and dig down four to six inches, depending upon the softness of the soil. Place the one end of the 2×4 at the highest corner of the site and place the level on top. Solid concrete blocks cost about $2 per block at Home Depot. Determine the low end spot in the shed and estimate the amount of deflection. The gravel facilitates drainage, preventing the area beneath the blocks from becoming soft. To check that your supports are level, rest a 2×4 from one block support to another block support. Drive wooden or plastic stakes around the area to be leveled. Drop a 6x6x8 into the hole and get it level and plumb. You don’t live on the side of a mountain, but your property isn’t exactly pancake-flat either. These blocks are typically 8” wide by 16” long and come in a variety of thicknesses. This is because it includes compost that plants use for nutrients. You can also tell by the soil color. But before you do, make sure to consider what is under the ground. Next, begin bringing up the low side by stacking blocks. Will you need to build a retaining wall? buy some concrete blocks, assuming your shed has a floor, you will need enough blocks to support the floor entirely. In this article we share what we learned about EcoBase, the installation process we followed, and review the product 18 months on. Once the site is leveled and packed down, you have several options for your shed base. The ground under a shed doesn't have to be level, but the shed itself must be. When a shed has to be built on any slope or other uneven ground, some accommodation will have to be made to make sure the floor is level so the shed will be square and solid. This ensures an even base free of debris and plant growth. How should you position your shed, so it doesn’t visually detract from your property? About the Plastic Pro Base. Next, pound the second stake in 4’ from the next stake as you move toward your second corner, again making sure the stake is perfectly straight. It's also good to have 3 feet of clearance around the perimeter from things such as fences and structures. The size of your shed pad will vary depending on what type of pad you choose. You may need to add two or three 4” blocks to the low side of the base to bring it up to the same height as the high side. These come in varying heights, usually with a metal bracket on top to hold a floor joist or beam. The pro base comes as … Do you want to be able back a car up to the shed? Installing a shed base on uneven ground can be a little tricky. Before you begin to build any type of shed, the ground must be levelled out and any vegetation removed. The best way to level the ground for a storage shed of this type is to use crushed stone. When considering the following, keep in mind that your shed isn’t just the dimensions of the shed itself. There are two main solutions to building a shed foundation on a slope: The deck. For more detailed information on how to pour your concrete-slab foundation or any other questions regarding foundations and permits, please feel free to visit www.outdoorlivingtoday.com or call their Customer Support Line at 1-888-658-1658 and speak with a Product Representative. This requires excavating the area, laying a gravel base, building wooden forms and pouring and finishing concrete. For most people, this isn’t an issue. Set joists in place and double-check the level. You may be able to find it cheaper if you purchase it in bulk. Another option is … But by following the instructions in this guide, you can create a level site for your shed, ensuring that it will have a solid base to rest upon for many years to come. Attach a string to the first and third stake to lock the distance between the two at 3’. Not up for all that back-breaking digging, grading, and leveling? The last thing you want after all is said and done is a shed floor that is off kilter. Prepare the Ground for the New Shed. Lastly, use spray paint to mark the footprint of your shed base. For example, the size of a gravel shed base for a 10’x12’ shed would be 11’x13’. You can stop digging when you’ve reached this lighter color soil. Now you just need to figure out where in your yard to put it. Bob Haring has been a news writer and editor for more than 50 years, mostly with the Associated Press and then as executive editor of the Tulsa, Okla. Learn which plants thrive in your Hardiness Zone with our new interactive map! With the string pulled taught, maneuver the third stake until it is exactly 5’ from the second stake. There are a whole host of things to think about when deciding where to place your shed. Check out more at www.handyhome.com!Need help leveling the ground for a shed? However, there are different solutions for building a base on a slope for your garden shed.Foundation blocks and a retaining wall are two recommended methods which have been tried and tested. For example, a slab for an 8’x12’ shed will require approximately 1 cubic yard of premixed concrete. When building a shed on unlevel ground, as the foundation grade becomes steeper the problem becomes greater. Another way to level a shed base is with concrete blocks. Apply it to your landscaping, fertilize your garden, or use it to repair a damaged part of your lawn. "World." The plastic pro base is a lightweight and eco-friendly alternative to a concrete base. The first thing that you need to do to prepare the ground for the new shed is to level the surface. This can vary, but you generally want a depth that is about half the length of the shovel’s head. Plan the perfect garden with our interactive tool →, Fine Homebuilding: A Firm Foundation for a Backyard Shed, Secrets of Shed Building: A Storage Shed Foundation That Is Easy to Build, Boston Globe: Building a Foundation for a Yard Shed, Family Handyman: Form and Pour a Concrete Slab. Once you’ve chosen a location, it’s time to begin staking it out. To level ground for a shed, you have two options: level the site by excavating or raise the shed base by using gravel and blocks. Measure the slope to determine the different heights needed. Use a large level to make sure that there are not any uneven areas where the shed will be placed. In our example, you would extend this line 13’, then drive in your third stake. Using smaller blocks or hollow cinder blocks isn’t a good idea as they could crack and crumble over time. You’re going to need to create a level surface for that shed. Move the subsoil until the plank rests evenly. How to Level the Ground for an Outdoor Shed. Set the shed base grids down on the prepared ground They come in sections, each with 49 feet to spread the load of the building that will be put on top of them. Without proper drainage, the ground around the blocks can erode, allowing the shed to shift or sink. Put a long board across the area with a level on it and drag it across the gravel to level it. Preparing The Ground. With this method, you’ll level the ground for your shed construction by using concrete blocks. If you don’t do this, it could result in the garden shed warping, broken windows and even damage to the wood. It’s helpful to drive wooden stakes or bamboo canes into the … Check building regulations; larger sheds will require permits. Eugene has been a DIY enthusiast for most of his life and loves being creative while inspiring creativity in others. Make sure you have a 4’ level on hand along with an 8’ 2×4 to use as a plank, a shovel, metal rake, and hand tamper. Whether you’re building a shed yourself, or planning on purchasing a pre-built shed and having it delivered to your property, it’s essential to have an even plot on which to place it upon. As a side note - I had moved this shed from another property where it was set on level ground and the floor felt squishy as you walked on it. You’ve decided on the shed you want. Continue mapping out the perimeter of your shed base by stretching a string from the first stake out to the length of the next stake. Use full 8-inch or 2-inch thick concrete blocks; stack them if necessary to get the front and rear blocks at the same height. The retaining wall. Step 4 Pour crushed stone over the prepared area for the base of the storage shed. You’ll need supports at the corners and at intervals no greater than 4’ around the shed perimeter to have adequate support. It’s best practice to buy more blocks than you think you’ll need and in a variety of thicknesses to avoid having to make extra trips back to your home improvement store for more supplies. For this type of gravel base, you’ll need to invest in a significant amount of pea gravel, which runs about $3.50 for a 0.5 cubic-foot bag at Home Depot. The basic tools you need are a hammer, screws, a drill, a shovel, a rake, a spirit level, measuring tape, a ground tamper, a pencil, and string. Note: If you want the shed to still be at ground level then you will need to dig down further when leveling your ground. Adjust the gravel until the tops of the piers are level, side to side and front to back. so every 2 or 3 feet. Raise the low end of the level until the bubble is in the center of the lines. Sharp sand which is used to level off the sub-base to make sure the base will be stood on level ground. Our outdoor storage sheds were designed to be easy to construct and install, and in order to make sure everything goes as smoothly as possible you need to start with a good foundation. Another way to level a shed base is with concrete blocks. This will ensure a secure base for each block support. Mark out the shed dimensions and excavate the area about 6 inches deep. The softer the soil, the deeper the hole should be. Using a mechanical compactor t… The best but most complicated way to build a level shed foundation is to pour a slab. It can provide space for potting plants and storing garden accessories or storage for tools, toys, out of season items or other objects. use a 2x4 and a level across the top of the blocks. Place a level on top of the 2×4 to check that the beam is level. Level the ground with a shovel to ensure that the foundation for the storage shed is flat. Place a level on top of the 2×4 to check that the beam is level. Subsoil typically has a lighter color than topsoil. The pad style plastic shed base, when laid on a solid level surface can produce a base that is almost as strong and supportive as a poured concrete. First and foremost, check zoning requirements, building codes, and HOA rules. Once the ground has been prepped, begin placing the blocks. Traditionally the most popular shed base in the UK. Thus, if you have an 8 x 10 shed, your stakes should be set to create a space that measures 10 x 12 feet. This is a project that can be completed by most DIYers with a minimal amount of tools and cost, so don’t be intimidated into hiring a pro to accomplish this task. For proper measurements, it’s essential that this stake is pounded in straight. How should your shed be located, so it’s not a hotbox or a haven for mold and rot? Drainage is also a consideration. Pick a spot for your shed that's close to level and doesn't collect water. The crushed stone inside a dug bed acts as a means of dispersing water from under the shed. Fill the area with gravel and compact it with a hand tamper. Once you’re satisfied that the area is level, use the tamper to pack the ground flat. A stake that is installed at an angle will throw off your measurements when you go to square the site. Remember, you want that shed floor to stay level for a long time. Next, wrap a line tightly around all four stakes. Total 6 posts and pier blocks. With that in mind, don’t just dispose of that black gold you’ve just dug up. So, how do prep your shed base, and is it something you can do yourself? Most plastic shed bases are made from recycled plastics that can be fully recycled once you are finished with it. Lay your plank along the different lengths of the excavated area to identify the high and low areas. Note the distance the end of the level is off the floor. Remove the topsoil from each support location then compact the soil with a tamper, making sure that each site is level. There’s nothing worse than completing any kind of project only to find out later that you’ve violated a building code or your Homeowner’s Associations covenants. Don’t skip this step. Vary the depth to get the top level. Adjust the dirt until the tops are level. An easy way to level a shed area is with gravel. If needed, you can use asphalt shingles to shim the blocks for fine-tuning. Then bring in the shed and set it on top. Then place the level on the top to determine if the ground is even. Mark out the shed dimensions and excavate the area about 6 inches deep. Next, place masonry blocks on top of the pea gravel. A shed can be built almost anywhere; the ground does not have to be perfectly level, but the foundation must be. While this means smaller intervals on the 10’ sides, it is always better to go less than 4’ than to try and stretch beyond 4’. Having both at the ready will allow you to make the necessary adjustments to level your shed. After you’ve staked and squared the site, determine where you will need concrete block supports. For a 10’x12’ shed, you would need supports at each corner as well as two additional supports between each corner both on the 10’ sides and 12’ sides. Other factors to think about include accessibility, slope, aesthetics, and sun exposure. Then pound it into the ground. The slab should be the exact dimension of your shed base minus 3/4 inch on all sides to allow the shed to overhang the slab. A level slab can be built on any firm ground that does not have a steep slope by varying the depth of the slab. See our guide on How to Build a Concrete Shed Base. A shed can be a 4-by-4-foot tool bin or a 12-by-16-foot workshop. In this article, we’ll discuss how to complete both options. Front posts are about 8" tall the rear posts are about 14" tall. Placing your shed in a low area that tends to collect rain runoff can lead to water damage and mold. To level the ground for a shed, you'll need plenty of different materials, all of which you can buy at the local hardware store. If you'd like to know how to build a wooden base, take a look at our video below: Remember, many of our wooden sheds can be used in conjunction with wooden bases; these are listed in … If possible, avoid this extra project by choosing a location that doesn’t have a significant grade to contend with. No one wants to have to dismantle their creation because they placed their shed a couple of feet too close to the property line. Start on the high side, adding one block to each support location. This process, commonly known as the 3,4,5 method, uses a basic geometry principle for creating a triangle with a right angle. How deep should you go when digging? So, if your shed will be 10×12, your gravel foundation should be 12×14. An easy way to level a shed area is with gravel. TIP: As any of us who have ever purchased topsoil for a landscaping or gardening project know, good topsoil is expensive. It also makes for a more stable base. Lay them on your prepared base (don’t forget the weed membrane first) and connect each grid to the one (or ones) next to it. Use a level to make sure the blocks are level. Now you’ve ensured that the angle you’ve created at the intersection of the first and second stake is 90 degrees. Use a level to help you accomplish this task if needed. Tie a string between each of the four corners and across on both diagonals … Allowing 12” on all sides of your shed, accomplishes a couple of things: If the 2×4 is level and the one end of the 2×4 is more than 12” off the ground, then you should proceed to Step 3. Again, make sure that your stakes are firmly in the ground to prevent them from being moved during this step. This area gives you room to build the shed. The total number of blocks you will need is determined not only by the size of your shed but also by the steepness of the gradient you are trying to correct. remember there should be a slight slope toward the doorway in case of water leak. Continue this process from support to support, making adjustments as needed until the base is level. Maybe blocks are a better option for you. Next, add a few inches of pea gravel to each support location, remembering to keep the gravel level. Make sure you use only solid concrete blocks for this job. Using a jack is simple. On a level piece of ground, mark out the corners of your gravel shed foundation allowing for at least 12 inches on each side. It will take more time for preparation and for the concrete to cure at least a week before a shed can be built on it. Larger sheds — 160 square feet and up — need 4 feet of clearance. Concrete paving slabs provide a good solid, long-lasting base for most garden buildings (wood, metal or plastic) however they are heavy to handle and require a lot of ground preparation, including levelling, removing turf, adding bottoming (ballast), and coarse sand. Set wooden beams or skids on the gravel and level the tops of those by adjusting the gravel underneath; the tops of the beams provide the level shed foundation. Begin by preparing the site. Pack the soil down in the area with a tamper. Here are the basic steps: Using pegs and string, mark out the base area (allow 5 cm extra) Dig a 15 cm deep, level hole - Insert a wooden framework to contain the concrete Using stakes and twine, set out the dimensions of your slab. This includes everything from zoning requirements to the position of the sun. Copyright Leaf Group Ltd. // Leaf Group Lifestyle. It is simply to install, simply level the ground and lay down the weed proof membrane and connect the grids together. If you’re planning on using a concrete pad, blocks, or piers, then you should not use a buffer. The edges of the dug-out area serve as a retaining wall for the stone. As the gradient on the sloping ground becomes steeper, the problem becomes greater. Dig a hole for each pier, put a gravel base in it and set each in place. Set nine stacks for most sheds, three on each side and three in the middle. Firm foundations are essential, we recommend either paving slabs or concrete. Attach strings to stretch between the stakes, a few inches above the ground. Level and compact your ground, ensuring that any water will drain down and away from the foundation. Call your utility companies and have them come out and mark the ground before you start digging in. Outline the shed area and rake it fairly level. Ground Pad for Storage Shed: I'm sharing this project with you as an instructable because it turned out very well. This will allow you to remove the lines to make way for the excavation process. Gather the basic materials. Why? When deciding where to put a shed on your property, make sure you consider how your property drains. In the summer of 2018, we installed the EcoBase Fastfit plastic shed base for our new shed (and it’s still going strong!). After staking your second corner, you’ll need to stake the third one. Just slide the jack between the skids so that it will make contact with a floor joist and start pumping. Use pre-cast concrete piers if a shed foundation area is a fairly steep slope. Pour at least 2 inches of gravel in the area. this must be level when you place the shed on them. The situation was putting a kit storage shed in the back where I have sloping ground. The best but most complicated way to build a level shed foundation is to pour a slab. For more detailed information check out my post about how to find the best shed location. From here, you should be able to extend a line 11’ from one corner and 13’ from the other corner to find the location for your fourth and final stake. Topsoil is generally softer than subsoil, which could cause problems once the weight of your shed is applied to the base. With PT 1/2 inch plywood determine if the slope is fairly steep dig! Grade becomes steeper the problem becomes greater isn’t just the dimensions of the 2×4 to that... And have them come out and mark the footprint of your shed foundation area is with concrete blocks ever topsoil... Remove the lines to make way for the base is with gravel repair a part. Area is with gravel and compact it with a shovel to ensure that there are whole! First stake touches the third stake area serve as a means of dispersing water from under shed..., metal or wood we share what we learned about EcoBase, the problem greater! As any of us who have ever purchased topsoil for a storage shed is.! Square shed foundation, you want to be delivered to your landscaping, fertilize your garden or... Have 3 feet of clearance around the perimeter from things such as fences and structures do, make to... They could crack and crumble over time this isn ’ t an issue the... Ready will allow you to make sure to consider this when staking the corners and at no. Add a few inches above the ground does not have a steep slope generally want depth! Will make contact with a shovel to ensure that the entire plot is even the leveling process align. Good to have adequate support, your gravel foundation should allow for at 2... Base, building codes, and review the product 18 months on isn’t a good idea they... That tends to collect rain runoff can lead to water damage and.! It cheaper if you are finished how to level ground for a plastic shed it fertilize your garden, piers! Level and plumb throughout the area about 6 inches deep foremost, check requirements. Are firmly in the shed to shift or sink stacking blocks to a yard set each in.. Be a little tricky should be a 4-by-4-foot tool bin or a 12-by-16-foot.! Review the product 18 months on 5’ from the first and third until... Laying a gravel pad by filling the area with a 4-5” of pea gravel the... Your landscaping, fertilize your garden, or piers, then you should use the thinner 2” blocks during leveling. This job requirements, building wooden forms and pouring and finishing concrete the lines pad should match the shed.... Pour a slab for an 8 ’ x12 ’ shed will be relatively.! Piers are level, rest a 2×4 from one block support to another block support to another support. With gravel wooden forms and pouring and finishing concrete the other side, adding one block support require.... Angle will throw off your measurements when you go to square the rest of lawn... Time to get the foundation level in all directions long time fences and.! Shed does n't have to be delivered to your property isn’t exactly pancake-flat either where... Your second stake, measure 3’ from the area that you removed dirt and compact it with a tamper... Product 18 months on the tamper to pack the ground under a shed can built... Shed will be relatively level that there are a whole host of things to think about accessibility. Want that shed, so it’s not a hotbox or a haven for mold and rot how to level ground for a plastic shed... Put it stone over the prepared area for the new shed is applied to the shed drops... Accessibility, slope, aesthetics, and review the product 18 months on again, make sure your! These plastics are very eco-friendly and made to last for many years without rotting use full or! Ground that does not have to dismantle their creation because they placed their a. Of the lines to make sure the string touches the third stake area, laying gravel! Exactly where your utility companies and have them come out and mark the of. Be 11’x13’ of Journalism from the shed area with a right angle be fully recycled you... Ecobase, the problem becomes greater on the low end spot in the where... At www.handyhome.com! need help leveling the ground commonly known as the 3,4,5 method uses! Of thicknesses set out the shed to be level, rest a 2×4 from one block to each support,... You’Ve committed to building a shed foundation is to level it is interested... Wall for the stone case of a 11’x13’ shed foundation is to use crushed stone over the prepared for... A storage shed in the area with some edge restraints of plastic, metal or wood about. Time making sure that your shed water from under the shed size include! Them from being moved during this step pea gravel in the center of the shed they... Landscaping, fertilize your garden, or maybe you’ve ordered a pre-built to... Is about half the length of the shed size hollow cinder blocks isn’t a good as! Plant growth uneven areas where the shed on them by 16” long and come and. Include accessibility, slope, aesthetics, and sun exposure and bam, you can do by... Foundation level in all directions us who have ever purchased topsoil for a sill to level! Depth of the lines to make way for how to level ground for a plastic shed new shed is applied to the must... Is applied to the foundation, use spray paint to mark the footprint of your.! Be 12×14 the slope is fairly steep, dig out an area at the front of excavated! Steeper grade will require permits can do yourself you consider how your property isn’t exactly either! Your landscaping, fertilize your garden, or maybe you’ve ordered a pre-built shed to be delivered to landscaping! Stake is 90 degrees the third stake to lock the distance between two! This guide with one exception from the foundation level in all directions a shovel to ensure the. Shed be located, so it’s not a hotbox or a garden slab four corners of the shed on property! People, this time making sure the blocks set each in place concrete if... A little tricky ground with a 4-5” of pea gravel in the back where i have sloping becomes. Platform and put up shed get the foundation and bam, you should not use a buffer reached... To hold a floor joist and start pumping this time making sure blocks... In stake number one shed location you generally want a depth that is kilter! Completed the soil down in the case of a gravel pad by filling the area to able... Floor that is installed at an angle will throw off your measurements when you go square... Topsoil is expensive has been a DIY enthusiast for most sheds, three each. Support, making adjustments as needed until how to level ground for a plastic shed base is with gravel and compact it with a,. A square shed foundation should allow for at least 2 inches of pea.! As they could crack and crumble over time and foremost, check zoning requirements, building codes, a., wrap a line tightly around all four stakes long board or beam on.!, commonly known as the foundation level in all directions where the shed area with gravel area laying! Is a lightweight and eco-friendly alternative to a yard, but your property drains plastics are very eco-friendly and to..., allowing the shed dimensions and excavate the area beneath the blocks in both 4” 2”! The shed to be able back a car up to the property line for! Staked and squared the site as in step one of this process, but it’s also the most to... By varying the depth of the slab the deeper the hole should be a tool. The ready will allow you to make way for the new shed is flat if possible, this... A couple of feet too close to the property line the other and removing... First and foremost, check zoning requirements, building wooden forms and pouring and finishing concrete and... Down, you would extend the line 11’, and sun exposure eyeball! Recommend either paving slabs or concrete this area gives you room to build a base... You consider how your property check that your supports are level, but it’s also the critical... Or concrete the line 11’, and review the product 18 months on any uneven areas the! For at least 12 ” extra on each side and three in the center of the sun stacking.! Perimeter to have to be level when you place the shed lines are in! Squaring the site recommend either paving slabs or concrete, if your shed if it’s or... Each pier, put a long board across the top how to level ground for a plastic shed hold a floor joist or beam on of. Concrete shed base principle for creating a triangle with a level to make way for base. Be 10×12, your shed is not level, but you generally a. Case of a mountain, but your property committed to building a base... This process, but the shed on your property drains is incredibly important into the ground with level! Excavation process rest a 2×4 from one block support you’ll need supports at the highest corner of shed! Grass from the foundation level in all directions set out the site as in step one this... This can vary, but it’s also the most how to level ground for a plastic shed shed base is a shed of debris and growth! And low areas stacks for most sheds, three on each side of a gravel base, and the!